P-12-B A5 bay B spall with no exposed rebar at this time.JPG
|
 |
P-12-B A5 joint is covered with asphalt is cracking and breaking up along shoulders.JPG
|
 |
P-12-B Approach at A5 with pothole forming in the Northbound lane.JPG
|
 |
P-12-B Channel flow through span3.JPG
|
 |
P-12-B Moderate stream abrasion along wall of P4.JPG
|
 |
P-12-B P3 asphalt is cracking up over joint. Several patch jobs have been done in the past.JPG
|
 |
P-12-B Pier 4 joint is ashalt cover except at shoulders.JPG
|
 |
P-12-B Raveling along shoulders with deep alligator cracks. This is the left side.JPG
|
 |
P-12-B Right side overview of the horizontal, and vertical cracks. Spalling along the base line. Weeds growing along shoulder.JPG
|
 |
P-12-B Scale has started along the top of the concrete curb. This is the right side of span 4.JPG
|
 |
P-12-B Tall brush is growing along bank at A5.JPG
|
 |
P-12-B-A LOOKING NORTH 2023 02 16.JPG
|
 |
P-12-B-B BRIDGE ELEVATION FROM UPSTREAM LOOKING EAST 2022 02 15.JPG
|
 |
P-12-B-B LOOKING EAST 2023 02 16.JPG
|
 |
P-12-B-C LOOKING NORTH 2023 02 16.JPG
|
 |
P-12-B-C SUPERSTRUCTURE FROM UNDERNEATH 2022 02 15.JPG
|
 |
P-12-B-b.JPG
|
 |
P-12-B-c.JPG
|
 |
P-12-B0F.JPG
|
 |
P-12B-a.JPG
|
 |
P-12B-b.JPG
|
 |
P-12B-c.JPG
|